Wear-rate comparison
Question
Can a media change reduce consumption without destabilizing throughput, product size or downstream performance?
Program
Freeze the operating baseline, define the transition period, record additions and normalize consumption against processed tonnes.
Evidence
Media additions, throughput, product size, power, breakage observations and abnormal operating events.
